| PRODUCTION
AND PRODUCTION BASE
The production base of the firm is distributed
between TPP ”Rousse East” and “Heat
supply ”division.
TPP ”Rousse East” is designated for combined production
of electric power and heat energy. It was built on stages from
1964 to 1985. Electrical part consists of two 110 MW condense blocks
with intermediate reheating and four steam-extraction turbo-generators
/2x30 MW and 2x60 MW/. The heating production part comprise 7 boilers,
burning imported coal T and TK brand with sulphur quantity /2.0-2.9%/,
ash /17-18%/, volatiles /8%/ with resources for generating together
with the steam-extraction turbines of 300 Gcal/h /349 MW/ industrial
steam and approximately 300 Gcal /h /291 MW/ hot water.
PTT "Rousse East" designed
capacit
| Steam Generator |
| Device |
SG1 |
SG2 |
SG3 |
SG4 |
SG5 |
SG7 |
SG8 |
| Stema load |
t/h |
220 |
220 |
365 |
365 |
220 |
220 |
220 |
| Heat capacity |
|
|
|
|
|
|
|
|
| Turbo generator |
| Device |
TG1 |
TG2 |
TG3 |
TG4 |
TG5 |
TG6 |
| Electric power |
MW |
30 |
30 |
110 |
110 |
60 |
60 |
| Heat capacity from
the regulated |
8-13 ata |
MW |
71 |
71 |
- |
- |
139 |
139 |
| 1.2-2.5 ata |
MW |
46 |
46 |
- |
- |
86 |
86 |
|

Production
platform of TPP “Rousse
east”
Division “Heat supply” includes transmission
and distribution of heat energy for public and residential buildings.
The heat transmission net consists of heat pipelines with heat
carrier reheated steam and hot water
1. North steam main pipeline /3328 m/ - supplies
reheated steam from TPP ”Rousse East “ to the users
in the East industrial region of Rousse.
2. North water main pipeline /18569 m/ - supplies
heat energy through heat carrier hot water from TPP ”Rousse East” to
the users in the East industrial region and the residential part
of
the town.
3. South steam main pipeline /2962 m/ - supplies
reheated steam from TPP ”Rousse East “ to the consumer “Iris“ company.
4. South water main pipeline /4086 m/ - supplies
heat energy through carrier hot water from TPP ”Rousse East” to
the consumers in the East industrial region and the residential
part of the town.
5. Steam pipeline “Zahar Bio” /3002 m/ - supplies reheated
steam from TPP ”Rousse East” to the consumer “Zahar
Bio” company.
6. West industrial zone /3994 m/ - supplies reheated
steam from TPP ”Rousse West” to the consumers in the West industrial
region.
Production process
“Toplofikatsia Rousse” JSC uses 4 types of energy resources – coal,
water, oil and natural gas for production of the three main products:

- electric power
- steam for industrial technological demands
- hot water
The electric power is transmitted to the Electric
grid through electric terminals Puhlevo dere, Baltata Dunav most
and Lipnik
with voltage of 110 kV
The steam /intermediate pressure/ is produced for
technological demands of the industrial enterprises in the town.
The hot water is used for daily wants in the houses,
administrative and public buildings. |